Messages
code
搜索
language
language
中文
language
EN
NEWS
NEWS
your location:
Homepage
/
/
/
Shandong Tianyi Chemical Co., Ltd. announced the first public announcement of the "1500 tons/year diphenylethane co-production 800 tons/year magnesium chloride technological transformation project of Binhai Branch"

Shandong Tianyi Chemical Co., Ltd. announced the first public announcement of the "1500 tons/year diphenylethane co-production 800 tons/year magnesium chloride technological transformation project of Binhai Branch"

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-08-27
  • Views:0

(Summary description)Shandong Tianyi Chemical Co., Ltd. Binhai Branch 1500 tons of diphenylethane co-production 800 tons/year of magnesium chloride technical transformation project

Shandong Tianyi Chemical Co., Ltd. announced the first public announcement of the "1500 tons/year diphenylethane co-production 800 tons/year magnesium chloride technological transformation project of Binhai Branch"

(Summary description)Shandong Tianyi Chemical Co., Ltd. Binhai Branch 1500 tons of diphenylethane co-production 800 tons/year of magnesium chloride technical transformation project

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-08-27
  • Views:0
Information
Shandong Tianyi Chemical Co., Ltd. Binhai Branch 1500 tons of diphenylethane co-production 800 tons/year of magnesium chloride technical transformation project, according to the "Environmental Impact Assessment Law of the People's Republic of China" and "Environmental Impact Assessment Public Participation Measures", The basic information of the project and environmental impact assessment are now publicized as follows:
1. Basic situation of the construction project
Project name: Binhai branch company 1500 tons of diphenylethane co-production 800 tons/year of magnesium chloride technical transformation project nature of the project: technical transformation
Construction site: No. 02266, Runfeng Road, Lingang Industrial Park, Binhai District, Weifang City, Shandong Province.
Construction content: Utilize 23 sets of newly added condensation distillation condensers, falling film absorbers, hydrolyzed water storage tanks and other equipment in the existing workshop to upgrade the existing diphenylethane production line. After the completion of the project, an annual output of diphenylethane will be formed. 1500 tons of alkane and 800 tons of solid magnesium chloride hexahydrate.
Existing projects and their environmental protection status: Existing "environmentally friendly flame retardant DOPO and intermediate diphenylethane project", "10th gas-fired heat-conducting oil boiler supporting project" and "100001 diphenyl co-production 50000to2ब potassium acid project".
Weifang Environmental Protection Bureau approved the “Environmental Impact Report on the Environmental Protection Flame Retardant DOPO and Intermediate Diphenylethane Project of Shandong Tianyi Chemical Co., Ltd.” on March 10, 2008 with the document No. 200838. The acceptance was organized on December 5, 2009 (Wei Huan Yan [2009) No. 63).
Weifang Environmental Protection Bureau approved the "Environmental Impact Report of Shandong Tianyi Chemical Co., Ltd. 10000ta Benzaldehyde Co-Production 50000to2 Potassium Back Acid Project" on June 8, 2015 with Weihuan Shenzi [2015] No. 17, the first phase The acceptance of the project was organized on November 23, 2016 (Weihuanyan [2016] No. 25), and the second phase of the project was organized on December 05, 2017.
As a whole, the existing projects have built corresponding environmental protection facilities and adopted corresponding environmental protection measures in accordance with the environmental assessment documents and approval requirements, and various pollutants have been discharged up to standards.
2. The name and contact information of the construction unit of the construction project
Construction unit: Shandong Tianyi Chemical Co., Ltd.
Contact: Zhang Ming
Tel: 182636116993, the famous organization of the environmental impact assessment agency undertaking the assessment work
Weifang Zhisheng Construction Project Management Consulting Co., Ltd.
4. Internet connection of the public comment form
See Annex 1 for details.
5. Ways and means of submitting the public comment form
This announcement ends within 10 days from the date of publication. The public can express their opinions on the project and the environmental impact assessment work by sending letters, faxes, e-mails, etc. to the designated public address within the time limit.
Shandong Tianyi Chemical Co., Ltd.
June 10, 2019

Scan the QR code to read on your phone

Related News

Shandong Tianyi Chemical Co., Ltd.

Tel:+86-536-5332160
Fax:+86-536-5337166
Mail:
tyhx2012@163.com
Contact:
General Manager of Sales: Dong Yong 
+86-13864609181

Alkyl ether product manager: Zhang Guohong+86-15853621258
Tetrabromine Product Manager: Guo Libao+86-13953692977
Hydrobromic acid product manager: Xu Lianhao+86-18264623789
Li Wenqiang+86-15964033379

Product Manager of Diphenyl Ether and Diphenyl Ethane:
Qu Wenjun:
+86-13853631553 Liu Peng:+86-13791695856
Potassium Nitrate Product Manager:
Qu Wenjun:
+86-13853631553  Zhang Tong:+86-15953686406
Wang Libo:11+86-18806466166  Liu Peng:+86-13791695856 

Potassium Nitrate Product Manager:

Qu Wenjun+86-13853631553 

Zhang Tong+86-15953686406
Wang Libo+86-18806466166 

Liu Peng+86-13791695856

 

Shandong Tianyi Chemical Co., Ltd.    鲁ICP备09065657号-1     Powered by 300.cn